SeeHistoric siteTempelhof and Neukölln
Schwerbelastungskörper
heavy load body

From 1941, 12,000 tons of concrete in a 15-m-high and 20-m-diameter cylinder were built to test the load-bearing capacity of the Berlin soils (turns out glacial sands are no good basis for gargantuan architecture) for Albert Speer's Germania buildings. Too massive for later blasting, this is one of the more bizarre remains of the Third Reich.
- Free entry
- Heritage listed
- Built 1942
- Address
- General-Pape-Str/Loewenhardtdamm
- Hours
- Tue-Wed 14:00-18:00; Thu 10:00-18:00; Sun 13:00-16:00. Closed Nov-Mar and Good Fri
- Price
- free entry
- Phone
- +49 30 902776163
Listing from Wikivoyage: Berlin/Tempelhof and Neukölln, CC BY-SA 4.0.
Location and details from OpenStreetMap, © OpenStreetMap contributors, ODbL.
Also listed in Overture Maps open data.
Updated 15 Nov 2026. Something wrong? Tell us.